Project
The QEII Centre Mews Lift Upgrade
Value: £1.2m
Client: QEII Centre
Project Manager: Turner & Townsend
Completion date: April 2020
The project scope comprised the strip out of the existing lift and creation of a new ramp over the existing podium as well as the new façade ready to receive the new 46 person lift. Once installed the existing paving and drainage levels were modified to suit the new lift entry as well as new internal works and a new lift enclosure installed.